(A) | Date of Connection:07.03.2014 | : | 07.03.2014 |
(B) | Whether three phase current Supplied | : | Yes |
(C) | Required KW | : | 17.42 KW |
Available KW | : | 20 KW |
S.No. | Name of Trade | Maximum number of unit in one shift | Power supply required as per norms | Power supply available in the Institute |
---|---|---|---|---|
1 | 2 | 3 | 4 | 5 |
1. | Electrician | 4 | 10.4 KW | 20 KW |
2. | Fitter | 2 | 7.02 KW | |
Total power supply requirement as per norms | 17.42 KW |
Present Electric Load | 20 KW |
|
Date of Connection | 07.03.2014 | |
Connection in the name of | Galav Rishi Pvt. Industrial Training Institute | |
Meter No. | MPC21642 | |
Seal No. | ||
Remarks |