| (A) | Date of Connection:07.03.2014 | : | 07.03.2014 |
| (B) | Whether three phase current Supplied | : | Yes |
| (C) | Required KW | : | 17.42 KW |
| Available KW | : | 20 KW |
| S.No. | Name of Trade | Maximum number of unit in one shift | Power supply required as per norms | Power supply available in the Institute |
|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 |
| 1. | Electrician | 4 | 10.4 KW | 20 KW |
| 2. | Fitter | 2 | 7.02 KW | |
| Total power supply requirement as per norms | 17.42 KW | |||
| Present Electric Load | 20 KW |
|
| Date of Connection | 07.03.2014 | |
| Connection in the name of | Galav Rishi Pvt. Industrial Training Institute | |
| Meter No. | MPC21642 | |
| Seal No. | ||
| Remarks |